Weldall Case - Virtek Laser Projection

Cutting Down Time in Manufacturing

Weldall

Weldall Case Study

The Project

Weldall reduced setup times from 6 or 7 hours to 1.5 hours on some parts and achieve 100% accuracy.

The Challenge

Metal forming shops, regardless of the size of the operation or the projects they tackle, are all faced with the task of laying up parts for assembly. It requires precision and time – a lot of time.

Virtek_Ametek VPS

The Solution

The Iris SPS enabled Weldall to reduce setup times from six or seven hours to 1.5 hours on some parts and achieve 100 percent accuracy.

Virtek_Transforming_Vision_Webbanner_00_1920x860

See our Solutions Live!

Book a Remote Demo Today! 

 

Our team of experts globally can set up a live or remote demonstration with your team at your convenience at any time.

 

Schedule today, we would be happy to help.